General Background ·
26
years’ experience in project management, with an emphasis in project controls
for offshore oil & gas MODU, SPAR FPSO, SSDR and jack-up, pharmaceutical
both new construction as well as outages, marine offshore, petro-chemical,
power, fossil, nuclear and waste to energy, gas compression, pipeline and
refining mining industries both new construction as well as
Turnaround’s. Software development and IT solutions. ·
Project
controls consisting of development and maintenance of construction -
engineering and outage scheduling and planning, tracking procurement
activities, material, equipment, fabrication and manpower. ·
Contractor
and Owner progress quantity tracking for various industrial projects throughout
the United States and Abroad. ·
Current
ISTC Basic Safety, ISTC Drug Screen Professional History (Clover) Chevron Phillips Chemical – Baytown TX USA Jan 2015 – Current Master Scheduler ·
Put
together Integrated Master Schedules (IMS), for the New Facilities Capital
Projects that were resource loaded and leveled ·
Prepare
and maintain team assurance plan and schedule assurance events as required ·
Risk
management and register prepare and managed Environment: Primavera P6.820, MS Project 2010. 2013, MS
Office Suite (Word, PowerPoint, Excel, Visio) (S3) Chevron – Houston TX USA June 2013 – Aug 2014 Master Scheduler ·
Put
together Integrated Master Schedules (IMS), for the water flood solution that
were resource loaded and leveled ·
Prepare
and maintain team assurance plan and schedule assurance events as required ·
Risk
management and register prepare and managed Environment: Primavera P6.820, MS Project 2010. 2013, MS
Office Suite (Word, PowerPoint, Excel, Visio) (Foot Bridge) Mustang – Houston TX USA Feb 2013 – May 2013 Master Scheduler ·
Put
together Integrated Master Schedules (IMS), that were resource loaded and
leveled ·
Performed
CPM schedule, earned value analysis, and provided this data to the client’s
management team. ·
Managed
cost control, schedule development, change orders and RFI’s. $150M Environment: Primavera P6.2, MS Project 2010, MS Office (GAS) Williams – Houston TX USA June 2011 – Jan 2013 Master Scheduler ·
Put
together Integrated Master Schedules (IMS) for KCC Pipeline and Gulfstar
Tie-In, that were both resource and equipment loaded from pre-FEED, FEED,
Engineering and Procurement ·
Performed
CPM schedule, earned value analysis, and provided this data to the client’s
management team. ·
Managed
cost control, schedule development, change orders and RFI’s. $700M Environment: Primavera P6.2, MS Project 2010, MS Office WorleyParsons – Houston TX USA Oct 2010 – June 2011 Master Scheduler ·
Put
together Integrated Master Schedules (IMS), that were both resource and
equipment loaded ·
Performed
CPM schedule, earned value analysis, and provided this data to the client’s
management team. ·
Managed
cost control, schedule development, change orders and RFI’s. $150M Environment: Primavera P6.2, MS Project 2010, MS Office (IMS) RIO DE JANERIO - BRAZIL March 2010 – October 2010 Master Scheduler ·
Put
together Integrated Master Schedules (IMS) for Transocean Navigator Drill
ship that were both resource and equipment loaded ·
Optimized
turnaround duration by critical path analysis ·
Cost
control management, earned value analysis, CPM schedule analysis. ·
Risk
management and register prepare and managed $150M Environment: Primavera P6.7, MS Project 2003, MS Office
Suite (Word, PowerPoint, Excel, Visio) JLHILLIARD CONSULTANTS/VASCO PROJECT SERVICES – HOUSTON TX USA September 2009 – April 2010 Scheduling Consultant/Master Scheduler ·
Put
together Integrated Master Schedules for turnaround/capital projects both
resource-loaded and equipment-loaded ·
Optimized
turnaround duration by critical path analysis ·
Cost
control management, earned value analysis, CPM schedule analysis ·
Risk
management and register prepare and managed Environment: Primavera P6.0, MS Project 2003, MS Office
Suite (Word, PowerPoint, Excel, Visio) FISHBONE SOLUTIONS – PORT NECHES TX USA May 2008 – August 2009 Master Scheduler / Project Controls Manager ·
Put
together Integrated Master Schedules for turnaround that were both resource
and equipment loaded. ·
Project
controls manager/site manager on TA located at Port Neches TX for Huntsman
Chemical. ·
Optimized
turnaround duration by critical path analysis. ·
Managed
cost control, schedule development, change orders and RFI’s. ·
Performed
CPM schedule, earned value analysis, and provided this data to the client’s
management team. $100M Environment: Primavera P3, MS Project 2003, MS Office (Word,
Excel, PowerPoint, Visio) INNOVATIVE TURNAROUND CONTROLS INC PASADENA TX USA February 2005 – May 2008 Master Scheduler / Senior Project Controls Specialist ·
Technical
Director for ITC both in the home office and assigned on various projects
when ITC’s clients needed advanced project controls experience, during
turnaround’s, capital improvement projects up to $850 MM. ·
Put
together Integrated Master Schedules for turnaround – both resource-loaded
and equipment-loaded. ·
Process
and procedure audits for various clients including Monsanto, Shell and
PRSI. ·
Senior
trainer in P3 3.1 and 6.0. MS Project Senior Trainer. ·
Optimized
turnaround duration by critical path analysis ·
Cost
control management, earned value analysis, CPM schedule analysis. Environment: Primavera P5/P6, MS Project 2003, MS Office
Suite (Word, PowerPoint, Excel, Visio) BP EXPLORATION AND PRODUCTION COMPANY USA January 2001 – January 2005 Master Scheduler / Project Services Team Lead
Holstein SPAR/Thunder Horse SS Project’s Houston TX USA
·
Oversee
project team capitol and P&O budgets, well cost estimating data and
process, and coordination of budget and cost interfaces with the other
Thunder Horse project teams including subsea/ installation/topside install
and pipeline install. ·
Put
together Integrated Master Schedules for turnaround – both resource-loaded
and equipment-loaded. ·
Prepare
overall wells delivery logistical plan to ensure lowest possible support cost
structure. ·
Establish
and oversee team documentation and formation sharing system. ·
Manage
Project Delivery planning and execution schedules linkages and interfaces
with other Holstein project teams. ·
Optimized
turnaround duration by critical path analysis. ·
Prepare
and maintain team assurance plan and schedule assurance events as required. ·
Maintain
competitor performance and lessons learned $3B Environment: SAP, MS Project 2003, Primavera P3, MS Office
(Word, Excel, PowerPoint, Visio) JAMES L. HILLIARD CST CONSULTANTS USA September 1998 – January 2001 Master Scheduler / Project Controls Manager
·
Premcor Refining & Marketing Houston TX / Port Arthur
TX
·
Schedule
analysis and review, as the owner representative on the HOUP project at the
Clark Refining & Marketing Port Arthur refinery. ·
Put
together Integrated Master Schedules for turnaround – both resource-loaded
and equipment-loaded. ·
Optimized
turnaround duration by critical path analysis. ·
Man-hour
review and usage, change order analysis, CPM review, and issuing EPC Gantt
reports and critical path analysis to management. $850M Environment: Primavera P3, MS Project 2003, MS Office (Word,
Excel, PowerPoint, Visio) Various Projects both domestic and abroad March 1989 – September 1998 Education BS Construction Management - 12/88 Southern Illinois University - Carbondale, Illinois Major
Studies: Construction Management, Accounting, Finance, Insurance, Labor
Relations, Entrepreneurial Ventures. AAS, Construction Technology Southern Illinois University - Carbondale, Illinois Computer Skills Primavera
3.1, 5.0, 6.0, 6.82 MS Project 2007, 2010, 2013, Excel, Word, PowerPoint,
Visio, Access, SAP 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|